
The Cambodia Preah Vihear Rowan to Kiri Sakor Railway and Mahlo Port Project involves the construction of a railway line connecting Preah Vihear province to Kiri Sakor district, culminating in the development of the Mahlo Port. This foreign engineering contracting project aims to enhance transportation infrastructure, facilitating trade and economic growth in the region.

Railway turnout system designed for use in coal railway operations. The system includes rails, ballast, switch mechanism, and a control box.

This project involves railway infrastructure development. Heavy machinery is used to place pre-fabricated concrete railway sleepers.